Project | Reconstruction and modernization of signalling/interlocking system for construction of 2nd track on the railway line section Pancevo Bridge – Pancevo Glavna of railway line Belgrade Centre-Pancevo Glavna-Vrsac-state border with Romania
Date: 06/2016 – 10/2016
Location: Serbia
Project | Reconstruction and modernization of signalling/interlocking system for construction of 2nd track on the railway line section Pancevo Bridge – Pancevo Glavna of railway line Belgrade Centre-Pancevo Glavna-Vrsac-state border with Romania
Services | Independent Safety Assessment of technical solution required for issuing the Conformity Report for the logic of the interlocking device SMARTLOCK 400 GP in railway station Pancevo Glavna, according to the Serbian national signalling rules
The scope of the assignment was to perform verification services for railway signalling devices for the Client (ALSTOM). The task contained the following activities:
- • Verification of the Functional Requirements for the SMARTLOCK 400 GP interlocking
- • Checking of the control tables
- • Checking of the graphical objects specifications (MMI)
- • Checking of the graphical objects specifications (MMI)
- • Technical support in the preparation of the application for certification by the Directorate for Railways
- • Technical support during training of railway staff
- • Technical support during technical acceptance process
View Project details
Experienced And Professional
Signalling Solutions Company specialised in railway signalling and telecommunication engineering.
For Further Inquiries Call
+381 64 2930 769
If you would like to cooperate with us or you need more information contact us directly.