Project | Reconstruction, modernization and construction of electro-technical infrastructure for double track railway Belgrade
Date: 02/2020 – 09/2020
Location: Serbia
Project | Reconstruction, modernization and construction of electro-technical infrastructure for double track railway Belgrade – Stara Pazova – Novi Sad – Subotica – Hungarian border, Section Stara Pazova – Novi Sad
Services | Independent Verification of the conventional signalling design
The objective of the assignment was to provide consultancy services to the Client (Italferr S.p.A) in the verification of the design documentation for railway signalling devices. The main activities performed during the period were the following:
- • Provide expertise in the verification and validation of designs for signalling devices on the project „Signalling systems Design for Construction Permit for рeconstruction, modernization and construction of electro-technical infrastructure for double track railway Belgrade - Stara Pazova - Novi Sad - Subotica- Hungarian border, section “Stara Pazova - Novi Sad” (technical compliance with Serbian and EU regulations from the signalling field);
- • Technical meetings with the Designer and Client in order to clarify all open issues;
- • Participation in the preparation of the Summary Report.
View Project details
Experienced And Professional
Signalling Solutions Company specialised in railway signalling and telecommunication engineering.